Scrim proposed as a ceiling finish in a commercial building. 2009 IBC

Ceiling finishes are controlled in Section 803 of the 2009 IBC. As long as the material complies with the fire performance and smoke development in accordance with section 801.1.1 or 801.1.2, you should be good to go.

Table 803.9 requires a Class "C" (see section 803.1.1) at the ceilings of M occupancies that are sprinklered.

Add Reply

Likes (0)
×
×
×
×
×